RelevanceRel. | CCVM | SET Facility | Description |
---|---|---|---|
100% | 3.23 | BETHSY [3.23] | Description |
100% | 11.41 | BWR-FLECHT/GE [11.41] | Description |
100% | 8.1 | GOTA BWR ECC Tests [8.1] | Description |
100% | 11.28 | HST, SSTF, VSF/GE Spray Tests [11.28] | Description |
100% | 7.3 | NEPTUNUS [7.3] | Description |
100% | 5.2 | Pressurizer Spray, TURIN [5.2] | Description |
100% | 6.10 | RRTF (Refill/Reflood Test Facility) Toshiba [6.10] | Description |
100% | 6.11 | SHTF (Spray Heat Transfer Test Facility) Toshiba [6.11] | Description |
100% | 11.18 | SNTF DART BWR Spray Nozzle [11.18] | Description |
50% | 4.10 | Thermodyn. Nonequilibrium RS 77 [4.10] | Description |
No CFD facilities