RelevanceRel. | CCVM | SET Facility | Description |
---|---|---|---|
100% | 10.1 | ACHILLES Reflood Loop [10.1] | Description |
100% | 3.17 | COSI [3.17] | Description |
100% | 3.26 | ECOTRA [3.26] | Description |
100% | 11.29 | FLNCF/SRI 4 Loop Natural Circulation [11.29] | Description |
100% | 3.10 | PATRICIA GV 1 [3.10] | Description |
100% | 3.25 | REBECA [3.25] | Description |
100% | 11.30 | U-Tube SG Two-Loop Test Fac/SRI [11.30] | Description |
50% | 5.2 | Pressurizer Spray, TURIN [5.2] | Description |
50% | 2.1 | REWET-I [2.1] | Description |
50% | 11.55 | Reflux Rig/Univ. Cal. St. Barbara [11.55] | Description |
No CFD facilities